| 1. Site & Setting Out | Site cleared; building positioned correctly; boundaries, building lines, dimensions and levels checked | ☐ Pending ☐ Passed ☐ Rectification |
| 2. Foundation Excavation | Trenches excavated to required width/depth; ground conditions checked before concrete | ☐ Pending ☐ Passed ☐ Rectification |
| 3. Footings Before Concrete | Trench dimensions, levels, reinforcement where required and footing preparation inspected before pouring | ☐ Pending ☐ Passed ☐ Rectification |
| 4. Foundation Concrete | Concrete placement, thickness, width, mix and finished levels checked | ☐ Pending ☐ Passed ☐ Rectification |
| 5. Substructure Brickwork | Foundation walls, wall thicknesses, brickwork, brickforce and levels checked | ☐ Pending ☐ Passed ☐ Rectification |
| 6. DPC Level | Damp-proof course, wall levels and building dimensions checked before backfilling | ☐ Pending ☐ Passed ☐ Rectification |
| 7. Backfilling & Compaction | Approved fill/hardcore placed in layers and adequately compacted | ☐ Pending ☐ Passed ☐ Rectification |
| 8. Under-Slab Services | Drainage, water pipes, sleeves and other services below slab inspected before covering | ☐ Pending ☐ Passed ☐ Rectification |
| 9. DPM & Slab Preparation | Hardcore, sand blinding, damp-proof membrane, mesh/reinforcement and slab levels checked | ☐ Pending ☐ Passed ☐ Rectification |
| 10. Floor Slab | Concrete slab thickness, placement, levels, curing and finish checked | ☐ Pending ☐ Passed ☐ Rectification |
| 11. Superstructure Walling | External/internal walls, openings, brickforce, dimensions, plumb and alignment checked | ☐ Pending ☐ Passed ☐ Rectification |
| 12. Window & Door Openings | Sizes and positions checked against drawings before lintels/frames are fixed | ☐ Pending ☐ Passed ☐ Rectification |
| 13. Lintels / Beams | Lintels, precast beams and structural beams inspected before loading or concealment | ☐ Pending ☐ Passed ☐ Rectification |
| 14. Ring Beam / Wall Plate Level | Reinforcement, formwork, dimensions and concrete inspected before/after casting | ☐ Pending ☐ Passed ☐ Rectification |
| 15. Roof Structure | Trusses, rafters, bracing, wall plates, connections and roof structure checked before covering | ☐ Pending ☐ Passed ☐ Rectification |
| 16. Roof Covering & Rainwater | Roofing, flashing, gutters and downpipes checked | ☐ Pending ☐ Passed ☐ Rectification |
| 17. Drainage & Sewer | Pipe sizes, gradients, inspection chambers, septic connection and leak tests checked | ☐ Pending ☐ Passed ☐ Rectification |
| 18. Plumbing First Fix | Water supply, wastes and concealed plumbing checked before plastering/closing walls | ☐ Pending ☐ Passed ☐ Rectification |
| 19. Electrical First Fix | Conduits, boxes, cable routes and earthing arrangements checked before covering | ☐ Pending ☐ Passed ☐ Rectification |
| 20. Plastering & Finishes | Wall finishes, screeds, waterproofing and wet-area preparation checked | ☐ Pending ☐ Passed ☐ Rectification |
| 21. Windows & Doors | Frames, glazing, locks, burglar protection, sealing and operation checked | ☐ Pending ☐ Passed ☐ Rectification |
| 22. Plumbing & Electrical Final | Sanitary fittings, water system, drainage, electrical installation and testing completed | ☐ Pending ☐ Passed ☐ Rectification |
| 23. Practical Completion / Snagging | Full independent inspection; defects and incomplete items recorded | ☐ Pending ☐ Passed ☐ Rectification |
| 24. Final Council Inspection | Building checked for completion and compliance before occupation | ☐ Pending ☐ Passed ☐ Rectification |